Top latest Five Two-story light steel villa-Second floor case Urban news
The material database is set up from the BIM design, blended with the complete administration platform, the material procurement approach is formulated in accordance with the construction procedure and also the progress of the venture approach, and the fabric use types at Each individual phase in the construction are swiftly and correctly extracted